Short answer
Replacement cost reflects much more than the pipe: depth, route, access, ground, utilities, spoil and surface reinstatement can dominate the work.
Survey and route
Confirm which section needs replacement and whether the proposed route and levels are workable.
Site costs
Restricted machinery access, deep excavation, traffic management and nearby services can materially affect the scope.
Written quotation
Look for pipe specification, excavation, bedding, connections, testing, disposal and reinstatement to be described.
Before arranging work
Record what you have noticed, when it started and which fixtures or outside areas are affected. Ask the contractor to explain the evidence behind the recommendation, the limits of any inspection and what is included in the written scope. A useful quotation should separate investigation, immediate work and optional remedial work so that you can compare like with like.
Questions worth asking
- What has been observed and what remains uncertain?
- Which parts of the drainage are included?
- Are cleaning, reports, disposal, VAT and reinstatement included?
- How will additional work be agreed before it begins?
Find this service locally
Need help with this issue?
Tell us what you have noticed and which fixtures or outside areas are affected.
Contact our drainage team →