Completed project · Warminster

Roadside drainage clearance and ACO channel installation in Warminster

A combined project cleared an existing drainage line and added new measures to collect surface water and intercept debris.

The challenge

The site needed accumulated material removed from an existing drainage line together with new measures to collect roadside water and reduce debris entry.

Investigation and preparation

The existing drainage route and culvert entry were incorporated into a combined clearance and surface-water management scope.

Our approach

A combi tanker cleared the main line before a roadside gully, catch pit, ACO channel and mesh debris protection were installed.

Work completed

  • Used a combi tanker to jet and remove leaves, silt and debris from approximately 35 metres of drainage
  • Installed a roadside gully and catch pit
  • Excavated and installed approximately 6 metres of ACO channel drainage in concrete bedding
  • Completed the catch-pit and gully-grate arrangement
  • Added mesh protection at the existing culvert opening
  • Tested the system and captured before-and-after CCTV footage

Materials and equipment

  • Combi tanker
  • High-pressure jetting equipment
  • ACO channel drainage
  • Roadside gully and catch pit
  • Concrete bedding
  • Culvert mesh protection
  • CCTV equipment

Completion evidence

The recorded work combined clearance, new surface-water collection, debris interception, reinstatement and testing.

  • Leaves, silt and debris removed
  • New collection and debris-control components installed
  • System tested
  • Before-and-after CCTV footage captured