Completed project · Fordingbridge

No-dig CIPP structural drain lining in Fordingbridge

Four sections of 4-inch drainage were prepared and structurally lined from existing access points.

The challenge

Four separate 4-inch drainage sections required structural repair while avoiding excavation along the full pipe runs.

Investigation and preparation

The drainage was mechanically descaled, jetted where required and documented using pre-works CCTV footage.

Our approach

Cured-in-place structural liners were installed between existing chambers and soil vent pipe access points, followed by testing and post-works CCTV recording.

Work completed

  • Mechanically descaled and high-pressure jetted drainage where required
  • Prepared four separate runs for CIPP lining
  • Installed 4-inch cured-in-place structural liners between existing access points
  • Completed targeted ground reinstatement where required
  • Tested the completed drainage system
  • Recorded pre- and post-works CCTV footage

Materials and equipment

  • 4-inch CIPP structural liners
  • Mechanical descaling equipment
  • High-pressure jetting equipment
  • CCTV inspection equipment

Completion evidence

The four identified runs were lined, tested and documented with CCTV footage as part of the recorded scope.

  • Four identified runs lined
  • Completed drainage system tested
  • Pre- and post-works CCTV footage recorded