The challenge
Four separate 4-inch drainage sections required structural repair while avoiding excavation along the full pipe runs.
Investigation and preparation
The drainage was mechanically descaled, jetted where required and documented using pre-works CCTV footage.
Our approach
Cured-in-place structural liners were installed between existing chambers and soil vent pipe access points, followed by testing and post-works CCTV recording.
Work completed
- Mechanically descaled and high-pressure jetted drainage where required
- Prepared four separate runs for CIPP lining
- Installed 4-inch cured-in-place structural liners between existing access points
- Completed targeted ground reinstatement where required
- Tested the completed drainage system
- Recorded pre- and post-works CCTV footage
Materials and equipment
- 4-inch CIPP structural liners
- Mechanical descaling equipment
- High-pressure jetting equipment
- CCTV inspection equipment
Completion evidence
The four identified runs were lined, tested and documented with CCTV footage as part of the recorded scope.
- Four identified runs lined
- Completed drainage system tested
- Pre- and post-works CCTV footage recorded