The challenge
The kitchen drainage required both a structural pipe repair and a replacement route from the internal waste connection to the main access chamber.
Investigation and preparation
The existing system was cleaned and descaled before lining, and the recorded scope identified the internal gully for abandonment and replacement.
Our approach
The project combined a short CIPP liner with a new external bottle-trap gully, underground connection and core-drilled kitchen waste route.
Work completed
- Cleaned and descaled the drainage in preparation for lining
- Installed approximately 4.5 metres of 4-inch CIPP structural liner
- Abandoned and capped the existing internal gully
- Installed a new bottle-trap gully and 110mm underground pipework to the access chamber
- Core-drilled the external wall and installed 40mm PVC waste pipework and fittings
- Reinstated, tested and recorded CCTV and photographic evidence
Materials and equipment
- 4-inch CIPP structural liner
- Bottle-trap gully
- 110mm underground PVC pipework
- 40mm PVC waste pipework and fittings
- CCTV inspection equipment
Completion evidence
The recorded scope created a continuous route to the access chamber and included reinstatement, testing and documented evidence.
- New route connected to the main access chamber
- Paving and disturbed ground reinstated
- Completed system tested
- CCTV and photographic evidence recorded