Completed project · Weymouth

Coastal drainage and root clearance in Weymouth

Root growth, silt and coastal debris were removed from a restricted surface-water drainage run.

The project

The recorded scope was to restore a slowly draining external run and identify the source of repeated seasonal restrictions.

Work completed

  • Surveyed the accessible surface-water pipework
  • Mechanically cut back root growth at an identified joint
  • High-pressure cleaned silt and sand deposits
  • Recovered debris from the connected gully and chamber
  • Inspected the cleared joint for structural damage
  • Recommended a routine pre-winter maintenance visit

Completion record

The drainage restriction was removed and the cleared run discharged freely during the final flow test.