The project
The recorded scope was to repair a measured defective section using cured-in-place lining through existing access points.
Work completed
- CCTV inspected and measured the affected drainage
- Descaled the repair section and removed deposits
- Prepared the liner for the recorded pipe diameter
- Installed and cured the structural liner
- Reopened the branch connection after curing
- Completed CCTV verification and a flow test
Completion record
The defective section was structurally relined, reinstated internally and confirmed with post-installation inspection footage.
Related services
Planning similar drainage work?
Tell us what you have noticed, where the property is and whether you have survey footage or photographs.
Discuss your project →