Completed project · Midhurst

Rural manhole cover and frame replacement in Midhurst

A worn chamber cover and frame were replaced to provide secure access over private foul drainage.

The project

The recorded scope was to remove an unstable cover assembly and install a suitable replacement without altering the existing chamber.

Work completed

  • Secured the area and removed the unstable cover and frame
  • Cleaned and prepared the existing chamber opening
  • Installed a new appropriately rated cover and frame
  • Set the assembly level with the surrounding ground
  • Reinstated the immediate gravel surface
  • Checked chamber access, seating and cover operation

Completion record

The new cover was securely bedded, level with the surrounding surface and checked for safe routine access.

Related services

Planning similar drainage work?

Tell us what you have noticed, where the property is and whether you have survey footage or photographs.

Discuss your project →