The project
The recorded scope was to remove an unstable cover assembly and install a suitable replacement without altering the existing chamber.
Work completed
- Secured the area and removed the unstable cover and frame
- Cleaned and prepared the existing chamber opening
- Installed a new appropriately rated cover and frame
- Set the assembly level with the surrounding ground
- Reinstated the immediate gravel surface
- Checked chamber access, seating and cover operation
Completion record
The new cover was securely bedded, level with the surrounding surface and checked for safe routine access.
Related services
Planning similar drainage work?
Tell us what you have noticed, where the property is and whether you have survey footage or photographs.
Discuss your project →