The project
The recorded scope was to create a dedicated infiltration route for roof runoff away from a frequently saturated lawn.
Work completed
- Assessed ground levels and the existing downpipe routes
- Excavated a suitably sized soakaway pit
- Installed a geotextile-wrapped modular crate system
- Surrounded the system with clean drainage aggregate
- Connected new underground pipework from two downpipes
- Backfilled, levelled and tested the completed installation
Completion record
The new soakaway captured the connected roof-water outlets during testing, with the disturbed garden area reinstated and levelled.