The project
The recorded scope was to remove recurring root ingress and repair the accessible defective joint sustaining the intrusion.
Work completed
- CCTV inspected the restricted clay drainage run
- Cut back the root mass using specialist equipment
- High-pressure cleaned the affected pipe section
- Exposed and replaced the damaged clay joint
- Reconnected and bedded the replacement pipework
- Tested and CCTV verified the repaired drainage
Completion record
The roots were removed, the affected joint replaced and the repaired drain confirmed clear during post-work inspection.