The project
The recorded scope was to collect runoff from a paved approach and transfer it into an existing surface-water chamber.
Work completed
- Set out the channel route and required drainage fall
- Removed the affected paving and excavated the trench
- Installed channel drainage on concrete bedding
- Laid 110mm underground pipework to the chamber
- Reinstated the paving around the channel frame
- Completed a sustained water test at the collection point
Completion record
Runoff was collected by the new channel and transferred to the existing chamber during testing, with paving reinstated.