The challenge
Existing front downpipes and ACO channel drainage needed a new underground discharge arrangement.
Investigation and preparation
Existing accessible 110mm drainage runs were cleared and prepared before the new connection work.
Our approach
A modular soakaway was configured within an approximate 3m by 3m excavation and connected to the existing surface-water outlets with new 110mm pipework.
Work completed
- Cleared and prepared accessible 110mm PVC drainage runs by high-pressure jetting
- Excavated an approximate 3m by 3m pit, with depth determined by ground conditions
- Installed a geotextile-wrapped modular soakaway crate system
- Laid approximately 3 metres of new 110mm PVC pipework
- Connected the existing downpipes and ACO drainage
- Backfilled, reinstated and completed accessible connection checks
Materials and equipment
- Modular soakaway crates
- Geotextile membrane
- Pea shingle
- 110mm PVC pipework
- High-pressure jetting equipment
Completion evidence
The completed recorded scope combined drainage preparation, excavation, soakaway installation, new pipework and reinstatement.
- Existing downpipes and ACO drainage connected
- Immediate ground reinstated
- Accessible connections inspected and checked
Planning similar drainage work?
Tell us what you have noticed, where the property is and whether you have survey footage or photographs.